Drying equipment

China Drying Network In 2013, the central government allocated a total of 21.75 billion yuan in subsidies for the purchase of agricultural machinery to increase the level of agricultural mechanization and comprehensive agricultural production capacity.

The reporter learned from the Department of Agriculture of the Ministry of Finance that, compared with previous years, this year China has adjusted and optimized the subsidy structure for the purchase of agricultural machinery, and the types of subsidies for machinery have been expanded to 12 categories, 48 ​​subcategories and 175 items.

This year, we have also increased the central government's financial subsidies, increased the purchasing power of farmers, raised the subsidy limit for milking machines and dryers to 120,000 yuan; large tractors with 100 horsepower or more, high-performance green fodder harvesters, large-scale no-tillage seeders, and large-scale The combined harvester subsidy limit has been raised to 150,000 yuan; the single tractor subsidy limit for tractors above 200 hp has been raised to 250,000 yuan.

Hoisting Mechanism And Spare Parts

The hoisting mechanism for a Tower Crane typically consists of a combination of a motor, a gearbox, wire ropes, and a hook block. Here is a breakdown of its components and how they work together:

1. Motor: The hoisting motor provides the power needed to lift and lower loads. It is usually an electric motor that generates high torque to handle heavy loads.

2. Gearbox: The motor's rotational motion is transmitted to the hoisting drum through a gearbox. The gearbox helps increase the torque and reduce the speed of the motor, enabling the crane to lift heavy loads at a controlled speed.

3. Hoisting Drum: The hoisting drum is a cylindrical drum around which the wire ropes are wound. It is directly connected to the gearbox and rotates as the motor operates. The drum's size and design determine the amount of Wire Rope it can hold.

4. Wire Ropes:
The wire ropes are wound around the hoisting drum and connected to the hook block. These ropes are made of high-strength steel and have a high load-bearing capacity. Multiple wire ropes are used to distribute the load evenly and ensure stability during lifting operations.

5. Hook Block: The hook block is attached to the lower end of the wire ropes and is responsible for carrying the load. It consists of a pulley system with one or more sheaves, which allows the wire ropes to change direction and support the load securely.

During operation, the motor drives the hoisting drum through the gearbox. As the drum rotates, the wire ropes are wound or unwound, depending on the direction of rotation. This movement raises or lowers the hook block, allowing the crane to lift or lower loads.

The hoisting mechanism is controlled by the crane operator using various controls and switches. Safety features such as limit switches and overload protection systems are also incorporated to prevent accidents and ensure safe lifting operations.



Hoisting Mechanism,Tower Crane Lift Motor,Tower Crane Axial Fans,Tower Crane Hoist Motor, Tower Crane Hoisting Reducer

SHEN YANG BAOQUAN BUSINESS CO., LTD , https://www.syconstructionhoist.com